Before the installer leaves, confirm that every room cools, the condensate drains, and the equipment matches the quote. Then collect the invoice with the TDLR license number, the permit number and inspection result, and proof the warranty was registered, and watch how the system runs on the first hot afternoons.

Independent publisher, not a contractor

Reviewed · 15 named sources · No named reviewer yet; see our editorial policy.

On this page (14)
  1. Why the first days matter
  2. Before the installer leaves: the walkthrough
  3. Does the equipment match the quote?
  4. The paperwork to collect
  5. The permit inspection
  6. Warranty registration: the 60-day clock
  7. The first week of hot weather
  8. The condensate drain
  9. Worked example: a Garland ranch house
  10. First upkeep
  11. If something is wrong
  12. The full checklist
  13. Sources
  14. Questions

Why the first days matter

ENERGY STAR material states that nearly half of heating and cooling equipment in US homes never performs to its advertised capacity and efficiency because of installation problems. Many installation problems, such as a wrong charge, poor airflow, a sagging drain line or a mismatched coil, are easiest to spot and cheapest to fix in the first days, while the installer's labor warranty is fresh and the crew still remembers the job.

You do not need tools or HVAC training for most of this checklist. It is about what you can see, hear and feel, and about the paperwork you should hold before the final payment. Anything technical, such as refrigerant pressures, is a question for the installer, not a job for you.

Three windows

Use the checklist in three passes: before the crew leaves, over the first week of hot weather, and within the first 60 days for paperwork such as the permit result and warranty registration.

Before the installer leaves: the walkthrough

Ask for a walkthrough at the end of the job and go through these items with the lead installer. It usually takes a few minutes and settles most questions on the spot.

  1. Run it. Ask them to start the system in cooling with you present and let it run while you walk the house.
  2. Feel the supply air. Air from the vents should feel noticeably cooler than the room within a few minutes.
  3. Check the outdoor unit. The fan spins, the unit sits level on its pad, and there is clear space around it.
  4. Look at the indoor unit. In the attic, closet or garage: panels on, no loose wiring, drain line connected and sloped away.
  5. Confirm the thermostat. Ask them to show cooling, fan and, for a heat pump, heating and emergency heat settings.
  6. Find the filter. Know where it goes, which size, and how often they suggest changing it.
  7. Ask for the readings. Many installers record start-up measurements. Ask for a copy for your file.

If the delivered equipment differs from the quote, raise it now. Ask in writing why, and whether it is an equivalent matched system with the same ratings. The questions to ask an HVAC installer guide lists what the quote should have named.

Does the equipment match the quote?

Model numbers are printed on a rating plate on each unit: on the side or back of the outdoor condenser, and on the indoor coil and furnace or air handler. Photograph each plate and compare it with the quote and invoice.

A central split system's efficiency rating applies to the matched combination of outdoor unit and indoor coil, which is why a swapped coil matters even when the outdoor unit is right. Texas is in the DOE Southeast region. Since 1 January 2023 a split-system central AC under 45,000 BTU (about 3.75 tons) must be at least 14.3 SEER2 on the date it is installed; larger systems need 13.8. Split heat pumps need 14.3 SEER2 and 7.5 HSPF2 nationwide.

Equipment details to match against the quote
What to compareWhere to find itWhat a mismatch could mean
Outdoor model numberRating plate on the condenserA different unit or size than you paid for
Indoor coil modelLabel on the coil cabinetCoil reused or substituted; rating may not apply
Furnace or air handlerLabel inside the access panel areaDifferent blower than the matched rating assumed
Refrigerant typeRating plate on the condenserR-410A versus R-454B or R-32 not as quoted
Thermostat modelOn the device or its boxA cheaper or incompatible model

On refrigerant: Equipment made or imported since 1 January 2025 uses lower-GWP A2L refrigerants (R-454B or R-32) instead of R-410A. An EPA rule finalized in May 2026, effective 27 July 2026, removed the 1 January 2026 cutoff, so contractors may install pre-2025 R-410A systems until that stock runs out. Either can be legitimate, but it should be what the quote said. See R-410A versus the new refrigerants.

The paperwork to collect

Paperwork is your proof of what was installed, by whom, and under which warranty. The licensee’s number must appear on all advertising, proposals and invoices, an invoice is required for all ACR work, and proposals, invoices and written contracts must carry the notice “Regulated by The Texas Department of Licensing and Regulation, P.O. Box 12157, Austin, Texas 78711, 1-800-803-9202, 512-463-6599; www.tdlr.texas.gov”.

  1. An itemized invoice showing the company name, the TDLR license number and the TDLR consumer notice.
  2. Model and serial numbers for every piece of equipment.
  3. The AHRI reference number for the matched system, if the quote gave one.
  4. The permit number and which office issued it.
  5. The labor warranty terms in writing.
  6. Who is registering the equipment warranty, and the confirmation once done.
  7. Any start-up or test readings the installer recorded.
  8. The manufacturer's homeowner manual and warranty booklet.

In Texas, labor to repair or remodel residential property is not taxable; the materials are. Your invoice can be lump-sum (tax built into the contractor's material cost) or separated (tax shown on the materials line). Both are normal.

Check the license number on the invoice against the TDLR license lookup, and keep everything in one folder or one email thread. You will need it for a warranty claim or when you sell the house.

The permit inspection

In most DFW cities the contractor who pulled the permit also arranges the inspection. The inspector checks the installation against the city's adopted code. The permit record ties the work to your address, which can matter at resale.

The City of Dallas issues mechanical permits through its DallasNow portal so that work complies with the Dallas Mechanical Code and is performed by a licensed air-conditioning contractor. Installing or replacing a central system is mechanical work; no City page we found states the replacement rule in one sentence, so confirm with Development Services for your job. In the City of Dallas, from 1 June 2026 plumbing and mechanical rough inspections are scheduled together on the same day. TDLR adopted amended ACR rules effective 1 September 2026, moving the state’s adopted model codes from the 2021 to the 2024 editions. Cities enforce their own adopted codes; Dallas’s current set is the 2021 codes with local amendments.

  1. Ask for the permit number on the day of installation.
  2. Ask who schedules the final inspection and whether you need to give access.
  3. Ask for the result once it has passed, or look it up on the city portal if it offers one.
  4. If it fails, ask what failed, who fixes it, and when the re-inspection is.

Tie the final payment to it

If your contract allows, hold the final payment until the system is running and the inspection has passed. The Dallas-area permit guide lists which office handles each city.

Warranty registration: the 60-day clock

Registration is the item most often forgotten, and for some brands it decides how long the parts warranty lasts.

Trane extends its warranty term only if the product is registered within 60 days of installation; registered late, it keeps the base warranty. Lennox requires registration within 60 days of installation (or closing, for new construction) for its extended limited warranty. Other manufacturers set their own terms, so read the booklet for your brand.

If the installer registers it

Ask for the confirmation email or certificate, and check that your name, address, install date and serial numbers are right.

If you register it

Do it in the first week. You will need the model and serial numbers and the install date from the invoice.

See the AC installation warranty guide for how parts and labor warranties differ.

The first week of hot weather

DFW summers test a new system quickly. DFW averages about 20 days a year at or above 100 °F (1991–2020 normal, computed from the NWS Fort Worth 100-degree-day table). Average first 100 °F day: July 1. Average last: August 27. If your system was installed in spring or fall, the first real test may come weeks later, so keep the checklist until then.

On the first hot afternoons, pay attention to how the house feels and how the system behaves. You are looking for patterns, not single moments.

Symptoms in the first week and what they suggest
What you noticeWhat it can point toWhat to do
Short, frequent on-off cyclesOversizing or a setup issueNote how often it cycles and tell the installer
House cool but clammyToo little run time to remove moistureAsk about sizing and blower settings
One or two rooms much warmerAirflow or duct problemsCheck vents are open, then raise it
Runs constantly, never reaches setpointUndersizing, low charge or duct leakageRaise it while under labor warranty
Water near the indoor unit or ceiling stainDrain blocked, disconnected or poorly slopedShut off and call the installer
New rattle, buzz or vibrationLoose panel, line set contact or mountingRaise it promptly
Ice on the refrigerant lines or coilAirflow or refrigerant problemTurn cooling off, run the fan, call

For background, see problems with an oversized AC and hot and cold rooms.

The condensate drain

An AC removes moisture from the air, and that water has to go somewhere. In many DFW homes the indoor unit sits in the attic, so a drain problem can show up as a ceiling stain rather than a puddle.

Find where the drain line ends, usually outside near the foundation or into a plumbing drain. On a hot day it should drip steadily. Ask whether a secondary pan and a float switch were installed under an attic unit; the switch shuts the system off if the pan fills.

  1. Primary drain line ends where you can see it, and drips on hot days.
  2. Secondary pan under an attic unit is dry.
  3. Float switch is fitted, if the quote included one.
  4. No water marks on the ceiling below the unit.

Worked example: a Garland ranch house

Say a 1978 ranch house in Garland gets a new 3-ton AC in May. The walkthrough goes fine and the house cools. In the first week of June, the owner notices the system turning on and off every few minutes in the afternoon and the house feeling damp.

Using this checklist, the owner compares the rating plate with the quote and finds the outdoor unit is larger than quoted. They email the installer the same day with photos, ask why, and ask for the load calculation. The final payment is still held because the city inspection has not been completed.

This is a hypothetical case, but it shows why the order matters: photos and the quote in hand, a written question while the labor warranty is fresh, and payment tied to a finished job.

First upkeep

  • Change or clean the filter on the schedule the installer or manufacturer recommends. A clogged filter cuts airflow.
  • Keep plants, fencing and debris clear of the outdoor unit so it can move air.
  • Do not stack storage against the indoor unit or block return grilles.
  • Keep maintenance receipts with the invoice; manufacturer terms may refer to proper maintenance.
  • Ask whether a maintenance plan is optional, and what it includes, before buying one.

ENERGY STAR estimates that about 20 to 30 percent of the air moving through a typical duct system is lost to leaks, holes and poorly connected ducts. If rooms stay uneven after the install, ask about the ducts; ductwork sealing and replacement explains the options.

If something is wrong

  1. Write it down. Date, time, what you saw, photos or a short video.
  2. Contact the installer in writing. Email keeps a record. Reference the invoice and the labor warranty.
  3. Ask for a date. When will they come back, and what will they check?
  4. Keep the final payment tied to resolution, if your contract allows.
  5. Escalate if needed. Complaints against a licensee are filed with TDLR online or by mail.

Safety first

Water coming through a ceiling, a burning smell, or tripped breakers that keep tripping are reasons to turn the system off at the thermostat and call the installer, not to wait and watch.

The full checklist

  1. Every room cools; supply air feels noticeably cool.
  2. Outdoor unit level, clear, running quietly.
  3. Indoor unit closed up; drain connected; secondary pan dry.
  4. Thermostat works in every mode you need.
  5. Model numbers and refrigerant match the quote.
  6. Invoice with TDLR license number and consumer notice.
  7. Permit number and passed final inspection.
  8. Warranty registered, with confirmation, inside the manufacturer's window.
  9. Labor warranty terms in writing.
  10. No short cycling, clamminess, leaks or new noises in the first hot week.

Sources

Questions

What if the installed model differs from the quote?

Ask the contractor in writing why, and whether it is an equivalent matched system with the same ratings. Hold the final payment until it is resolved.

Who arranges the permit inspection?

Normally the contractor who pulled the permit. Ask for the permit number, the inspection date and the result.

How soon should the warranty be registered?

Check your brand. Trane and Lennox both tie extended terms to registration within 60 days of installation. Doing it in the first week avoids the risk.

Is short cycling normal for a new AC?

Frequent short cycles in hot weather can point to oversizing or a setup issue. Note how often it happens and raise it with the installer.

Should I check the refrigerant charge myself?

No. Refrigerant work needs certified technicians and gauges. Ask the installer for the start-up readings they recorded instead.

What if the installer does not respond?

Follow up in writing, keep records, and if the problem is with a licensed contractor's work, you can file a complaint with TDLR.

Next step

Free quote request

Get a quote to check against these numbers

  1. Tell us about the job. Service, ZIP, property and timing. The form says right away if your ZIP is outside the area.
  2. We check the license first. Requests go only to contractors whose TDLR air conditioning license we have matched on the state register. None is signed yet: if no checked contractor covers your ZIP, we email you and say so.
  3. Compare what comes back. Line the written quotes up in the quote-comparison tool.

No cost and no obligation. We are a publisher, not a contractor. Partner contractors will pay us for introductions; none is signed yet. How that works.

Request AC installation quotes

Free and no obligation. We pass a request on only to a contractor whose TDLR license we have checked and who covers your ZIP.

Enter a Dallas–Fort Worth ZIP (750–753, 760–762). Outside that, we do not have a partner yet.
Please add your name.
A phone number is how the contractor reaches you.
Please add a working email.
Get installation quotes